Artek Construction
  • Home
  • About Us
  • Services
  • Projects
    • Ongoing Projects
    • Completed Projects
    • Work Completion Certificates
  • Quality
  • Certificates
    • Quality Certificates
    • Military Certificates
  • News
  • Career
  • Contact Us
   
Stay connected
  • Türkçe
  • Aren Montenegro E-Katalog
Stay connected
Artek Construction Artek Construction
  • Home
  • About Us
  • Services
  • Projects
    • Ongoing Projects
    • Completed Projects
    • Work Completion Certificates
  • Quality
  • Certificates
    • Quality Certificates
    • Military Certificates
  • News
  • Career
  • Contact Us

Projects

HomeProjects
  • Project
  • Customer

Chiller Replacement Project U.S. Embassy Libreville

Ongoing Projects
RPSO
5%
>

Renovation of Koknese Region Nursing Home

Ongoing Projects
U.S. Army Corps of Engineers
5%
>

Purvciems EMS Garage Renovation

Ongoing Projects
U.S. Army Corps of Engineers
5%
>

HVAC Systems at U.S.

Ongoing Projects
RPSO
5%
>

IDIQ Contract HVAC Systems at DoS Worldwide Facilities

Ongoing Projects
RPSO
5%
>

DB-D-DJI-SC051; Replacement of Monaco Central Receiving System at Fire Dispatch

Ongoing Projects
KBR Services, LLC
5%
>

IEU-23-0032 Bulgaria GRAF Ignativeo Entry Control Facility

Ongoing Projects
U.S. Army Corps of Engineers
10%
>

Design/Build Construction ServicesAir-Cooled Chiller Plant Replacement

Ongoing Projects
US Consulate General
10%
>

Georgia MATOC

Ongoing Projects
U.S. Army Corps of Engineers
3%
>

LCV-D-GER-072722- Containerized Housing Units

Ongoing Projects
KBR Services, LLC
75%
>

Design/Build Construction Services Chiller Replacement Project

Ongoing Projects
US Consulate General
95%
>

Waste Water System

Completed Projects
39 CONS.
100%
06/01/2025
>

RepairInstall Water Backflow Preventers

Ongoing Projects
39 CONS.
20%
>

RepairInstall Fire Alarm Fire Protection B116 & B2115

Ongoing Projects
39 CONS.
95%
>

Repair Replace Asphalt Pavements, Fire Training Facility and Various Roads

Ongoing Projects
39 CONS.
20%
>

RENOVATION OF DELNICE PUBLIC SCHOOL

Ongoing Projects
U.S. Army Corps of Engineers
95%
>

Repair of Roof Coating at America House

Completed Projects
Us Embassy Kyiv
100%
>

Aren Village No:1

Ongoing Projects
Private Residental Building
30%
>

Aren Village no:2

Ongoing Projects
Private Residental Building
30%
>

Snow Tunnel Installation at Site K, Turkey

Completed Projects
KBR Services, LLC
100%
>

New Borehole Drilling And Pumps

Completed Projects
Amentum
100%
>

Kazcent Conference Center in Almaty, Kazakhstan

Completed Projects
U.S. Army Corps of Engineers
100%
>

Design/Build Construction Services Chiller Replacement Project,

Ongoing Projects
US Consulate General
20%
>

Non-Hazardous Solid Waste Management Services at DPTA – Jaworze and Ziemsko – Mogadisz

Completed Projects
KBR Services, LLC
100%
>

Repair Replace Asphalt Pavements, Fire Training Facility and Various Roads

Ongoing Projects
U.S. Army Corps of Engineers
20%
>

Repair Expansion Joint, Bldg 964

Completed Projects
U.S. Army Corps of Engineers
100%
>

Repair Airfield Striping Base Road

Ongoing Projects
U.S. Army Corps of Engineers
20%
>

Replace Antenna Tower Ladder

Ongoing Projects
U.S. Army Corps of Engineers
60%
>

Terrace Renovation at DCMR at Dabrowskiego 48

Completed Projects
US EMBASSY POLAND
100%
>

FAC WAR replacement of kitchen tiles Warszawska 200/30

Completed Projects
US EMBASSY POLAND
100%
>

Modify Deckhouse Louvers- Base Operations Services for Naval Support Facility,

Completed Projects
Vectrus
100%
>

Replace Floor in 49 CLUs throughout Camp Lemonnier, in support of JOC NAVFAC

Completed Projects
KBR Services, LLC
100%
>

Installation Entrance Sign

Completed Projects
KBR Services, LLC
100%
>

Installation of DFAC Temporary Shelter

Completed Projects
KBR Services, LLC
100%
>

HVAC and Power Generation

Completed Projects
KBR Services, LLC
100%
>

Reefers and Dry Storage Containers

Completed Projects
KBR Services, LLC
100%
>

HVACPOWERGEN- BRUNSSUM, NETHERLANDS- LCV EUCOM

Completed Projects
KBR Services, LLC
100%
>

Repair & Replace Roll-Up Doors for Building 7294

Completed Projects
U.S. Army Corps of Engineers
100%
>

Replace Two Elevators Base Clinic FAC 865

Completed Projects
U.S. Army Corps of Engineers
100%
>

Construct New Discharge Line

Completed Projects
U.S. Army Corps of Engineers
100%
>

Demolition of Two (2) Existing Concrete Pads

Completed Projects
KBR Services, LLC
100%
11/04/2022
>

Paving Tiles Replacement Services

Completed Projects
US Embassy Nur-Sultan, Kazakhstan
100%
19/06/2021
>

REPAIR OF CABANA AREA AT THE U.S. EMBASSY KYIV COMPOUND

Completed Projects
U.S. EMBASSY
100%
23/03/2022
>

CMR HVAC/ PLUMBING RENOVATION PROJECT US EMBASSY

Completed Projects
U.S. Army Corps of Engineers
100%
18/12/2021
>

ACFT YARD CONSTRUCTION, POWIDZ, POLAND

Completed Projects
KBR Services, LLC
100%
13/11/2021
>

SEARCH AND DEVOLOPMENT CENTER

Completed Projects
AGAKIM
100%
17/08/2021
>

IIMC Barracks

Completed Projects
U.S. ARMY CORPS
100%
>

ACFT YARD CONSTRUCTION

Completed Projects
LOGCAP V
100%
>

Renewal of Car Wash Station, Adana, Turkey

Completed Projects
U.S. CONSULATE ADANA
100%
16/08/2021
>

CMR HVAC/Plumbing Renovation Project US Embassy Zagreb, Croatia

Completed Projects
US Consulate General Regional Procurement Support Office Frankfurt [RPSOFR]
100%
>

Design/Build Renovation of School in Delnice, Croatia.

Ongoing Projects
US ARMY CORPS OF ENGINEERS
95%
>

Search and Devolopment Center

Completed Projects
AGAKIM
100%
>

AOSB RTE Street Road Construction

Completed Projects
AOSB REGIONAL DIRECTORATE
100%
05/07/2021
>

Border Reconnaissance Instruction Center Faculty Administrative Building (FAB)

Completed Projects
US Consulate General Regional Procurement Support Office (RPSO)
100%
13/08/2021
>

Border Reconnaisance Instruction Center (BRIC) Project

Completed Projects
AMERICAN CONSULATE GENERAL FRANKFURT
100%
13/08/2021
>

Construct Isolation Kennel Karaoy

Completed Projects
Us Socom
100%
12/08/2021
>

Construct Isolation Kennel Astana

Completed Projects
Us Socom
100%
11/08/2021
>

AOSB Renovation of Concrete Crossroads

Ongoing Projects
AOSB REGIONAL DIRECTORATE
80%
>

Repair Asphalt Between Pv & North Perimeter Road

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON
100%
05/01/2021
>

Mass Notification Alerting System for the SSL-A

Completed Projects
11th Missile Defense Battery, Kurecik, Malatya / TURKEY
100%
29/03/2021
>

Replacement of the Existing Main Distribution Panel (MDP)

Completed Projects
U.S. CONSULATE ADANA
100%
30/12/2020
>

Repair Sabancı Street Concrete Road

Completed Projects
AOSB REGIONAL DIRECTORATE
100%
28/07/2020
>

Construction Of Reinforced Concrete Building For Substation #2 (DM#2)

Completed Projects
AOSB REGIONAL DIRECTORATE
100%
07/09/2020
>

Msg Recreation Area Improvements

Completed Projects
U.S. CONSULATE ADANA
100%
16/07/2021
>

Physical Security Upgrade at the Southside of the Consulate Compound

Completed Projects
U.S. CONSULATE ADANA
100%
20/06/2019
>

Propane Gas Storage Tank

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON
100%
15/05/2021
>

AOSB Potable Water Treatment Facility Administrative Building

Completed Projects
Adana Hacı Sabancı Organize Sanayi Bölgesi Başkanlığı
100%
15/01/2019
>

AOSB Road Works

Ongoing Projects
AOSB
80%
>

Material Handling Equipment BPA

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON
100%
21/05/2019
>

TURNKEY CONSTRUCTION OF ALPET GAS STATION

Completed Projects
Altınbaş Holding / Alpet Petrol
100%
05/12/2018
>

Widen A Avenue

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON
100%
20/12/2021
>

Repair Replace Joint Seals Airfield Pavement

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON
100%
17/11/2019
>

Repair Asphalt Between Pv & N. Muns Road

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON
100%
05/01/2021
>

Design-Build Laboratory Renovation Project

Completed Projects
U.S. AMERICAN CONSULATE GENERAL
100%
>

Expand Concrete Pad 7203

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON
100%
04/04/2019
>

Repair Sidewalk BX Facility

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON
100%
30/04/2019
>

RPR Paint Road Striping

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON
100%
20/06/2019
>

Repair Road In Front Of Bldg 3850

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON
100%
05/01/2021
>

Repair Pavement Bridge Project 3

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON / 39 Cons/LGC
100%
12/12/2018
>

01 BURDA Shopping Mall Project Wet Area Construction works

Completed Projects
SEY AVM İnşaat A.Ş
100%
15/11/2018
>

Repair Asphalt Between PV & North Munitions Road LJYC 20-1040

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON
100%
05/01/2021
>

Roads & Grounds ID/IQ Contract

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON
100%
15/05/2019
>

Design and Construction PITT

Completed Projects
U.S Embassy
100%
02/08/2018
>

Clean Up O&M Junk Yard

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON / 39 Cons/LGC
100%
20/07/2018
>

Repair Ventilation & Drainage Basement B526

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON / 39 Cons/LGC
100%
17/07/2018
>

Hardstand Pavement Expansion 7-9

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON / 39 Cons/LGC
100%
14/06/2018
>

CarrefourSa Shop Renovation and construction works of Mersin/Tarsus

Completed Projects
CarrefourSa A.Ş
100%
14/05/2018
>

CarreforSa Shop Renovation and construction works of Mersin/Göçmen

Completed Projects
CarrefourSa A.Ş
100%
14/05/2018
>

Repair Road Pavement Taxiway A&c North

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON
100%
21/04/2018
>

South Ecp Upgrades

Completed Projects
Sallyport
100%
14/03/2018
>

Renovation of Office Building of Anadolu Bank Yüreğir Branch

Completed Projects
Habaş Grup
100%
07/03/2018
>

Renovation of Office Building of Anadolu Bank Osmaniye Branch

Completed Projects
Habaş Grup
100%
12/07/2018
>

East Ecp Upgrades At Balad Air Base

Completed Projects
U.S. AMERICAN CONSULATE GENERAL
100%
15/01/2018
>

Install Tie-downs And Gounding Points, Hardstand 8-9

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON / 39 Cons/LGC
100%
11/12/2017
>

Repaint Airfield Markings

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON / 39 Cons/LGC
100%
26/10/2017
>

Rpr/ Replace Roll-up Doors Bldg 977

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON / 39 Cons/LGC
100%
10/10/2017
>

Himars Fuel Tanks Rent

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON / 39 Cons/LGC
100%
01/09/2017
>

Dbl Wide, Dbl Stacked Containers Task Order

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON / 39 Cons/LGC
100%
31/08/2017
>

Rpr/Upgrade Ws3 Facility B91

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON / 39 Cons/LGC
100%
10/10/2017
>

Life Support Services For Exercise Steppe Eagle 2017

Completed Projects
Department Of The Army Regional Contracting Command - Camp Arifjan, Kuwait
100%
08/08/2017
>

Cns/Pave Parking In Front Of Gate 7

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON / 39 Cons/LGC
100%
30/06/2017
>

HIMARS DE-CONSTRUCTION

Completed Projects
39 CONS
100%
12/06/2017
>

Rpr A Ave And 4th St

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON / 39 Cons/LGC
100%
31/05/2017
>

Guard Tower Prime Power Upgrade

Completed Projects
U.S. American Consulate General
100%
20/05/2017
>

Airfield Signage Lighting Upgrade

Completed Projects
U.S. American Consulate General
100%
20/05/2017
>

Replace Carpet Various Facilities

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON / 39 Cons/LGC
100%
18/05/2017
>

Upgrade Of The Navaids Items For Runways Approach Lighting Balad Air Base

Completed Projects
Sallyport
100%
15/05/2017
>

Navaids Civil Rapcon

Completed Projects
U.S. American Consulate General
100%
05/05/2017
>

Rpr-Roof Dfac Bldg 965

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON / 39 Cons/LGC
100%
06/04/2017
>

Installation Of Indoor Public Adress (PA)

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON / 39 Cons/LGC
100%
17/03/2017
>

Rpr Roof Bldg 125

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON / 39 Cons/LGC
100%
04/02/2017
>

Repair Renovate LSA Building

Completed Projects
USAFE - 39TH CONTRACTING SQUADRON / 39 Cons/LGC
100%
01/02/2017
>

Construct, Deliver And Install Office Containers And Latrines

Completed Projects
39 CONS/LGC
100%
23/12/2016
>

Repurpose Hanger 7298

Completed Projects
Usafe - 39th Contracting Squadron
100%
09/06/2016
>

Repurpose Hanger 7299

Completed Projects
Usafe - 39th Contracting Squadron
100%
09/06/2016
>

Construction Of Modular Shelter Complexes 2

Completed Projects
U.S. American Consulate General
100%
03/06/2016
>

Renovation Of Weapons Training Center

Completed Projects
U.S. American Consulate General
100%
15/05/2015
>

Practical Exercise Traning Area

Completed Projects
U.S. American Consulate General
100%
25/02/2016
>

AOSB Additional Area Infrastructure Work

Completed Projects
AOSB
100%
19/02/2016
>

Design Of New Silos

Completed Projects
CP Feed Mill
100%
03/06/2015
>

AOSB Wastewater Treatment Plant Renovation Works

Completed Projects
AOSB Bölge Başkanlığı
100%
01/05/2015
>

Construction Of Modular Shelter Complexes

Completed Projects
U.S. American Consulate General
100%
09/04/2015
>

Air Compressor Installations

Completed Projects
US Army, Bagram Airfield
100%
17/03/2015
>

RPR Replace HV Cable @TR41, TR44, SW 3

Completed Projects
39 Cons/LGC
100%
09/03/2015
>

Landscaping Works for Additional Areas of Electricity Distribution Center Buildings

Completed Projects
AOSB Bölge Başkanlığı
100%
09/02/2015
>

Fov Mrap (Rcv Service Project, Socom Service Project, Thomas Fuller Maintenance Service Project)

Completed Projects
ManTech Technical Services
100%
30/10/2014
>

Comm Tech Refresh

Completed Projects
39 Cons/LGC
100%
25/10/2014
>

Musical Instruments

Completed Projects
39 Cons/LGC
100%
25/09/2014
>

Construction Of Prefabs

Completed Projects
Royal Netherlands Army
100%
15/08/2014
>

Rpr Roof Building #877

Completed Projects
39 Cons/LGC
100%
19/03/2014
>

Rpr Roof Building #282

Completed Projects
39 Cons/LGC
100%
10/01/2014
>

Construction of Solidsun Solar Energy Factory and Administrative Building

Completed Projects
Artek construction
100%
24/09/2013
>

DISA/NSA Two (2) Story Concrete Housing Facility

Completed Projects
US Army, Bagram Airfield
100%
11/09/2013
>

Retrograde Yard Gravel

Completed Projects
ManTech Technical Services
100%
03/09/2013
>

Joc Rear Apron

Completed Projects
US Army, Bagram Airfield
100%
01/04/2013
>

Repair Replace Automatic Transfer Switch Soc2

Completed Projects
39 Cons/LGC
100%
28/02/2013
>

Joc Ecp Security Improvement

Completed Projects
US Army, Bagram Airfield
100%
11/02/2013
>

LSA Construction Work

Completed Projects
DHL
100%
31/12/2012
>

Sharana 2 Connex, 4 Connex And Latrine Shower

Completed Projects
ManTech Technical Services
100%
05/12/2012
>

HVAC

Completed Projects
US Army, Bagram Airfield
100%
05/12/2012
>

MSC4 LSA Uprage Additional Work

Completed Projects
US Army
100%
27/11/2012
>

Water Utility Infrastructure

Completed Projects
US Army, Bagram Airfield
100%
20/11/2012
>

RCV Compound

Completed Projects
ManTech Technical Services
100%
22/09/2012
>

Painting Of 4038 Building

Completed Projects
US Army, Bagram Airfield
100%
05/08/2012
>

Completion Of Peo Soldier Warehouse

Completed Projects
US Army, Bagram Airfield
100%
25/07/2012
>

Walkway Mateials & Installation

Completed Projects
US Army
100%
20/07/2012
>

Sharana Fencing Repairs

Completed Projects
Mantech International Corporation
100%
19/07/2012
>

Complete Peo Soldier Storefront

Completed Projects
US Army, Bagram Airfield
100%
05/07/2012
>

Office Containers

Completed Projects
US Army
100%
15/06/2012
>

Septic Tank

Completed Projects
ManTech Technical Services
100%
12/06/2012
>

Shower And Latrine MTBI

Completed Projects
US Army
100%
14/05/2012
>

Sharana Tent Erection

Completed Projects
ManTech Technical Services
100%
27/04/2012
>

DFIB CMU Communication Building

Completed Projects
US Army
100%
03/04/2012
>

De-Icing Stations

Completed Projects
US Army
100%
03/04/2012
>

Bagram Laundry Renovation

Completed Projects
ManTech Technical Services
100%
09/03/2012
>

Socom BAF Housing,10 Container

Completed Projects
ManTech Technical Services
100%
02/03/2012
>

Mild Traumatic Brain Injury (MTBI) Shower & Latrine Install

Completed Projects
US Army, Bagram Airfield
100%
21/02/2012
>

HVAC Replacement, Rock Gym

Completed Projects
US Army, Bagram Airfield
100%
06/02/2012
>

Sharana Tent Erection And Foundation

Completed Projects
Mantech International Corporation
100%
04/02/2012
>

Sharana Fencing, Site Preparation

Completed Projects
Mantech International Corporation
100%
31/01/2012
>

Sharana Fencing, Site Preparation

Completed Projects
Mantech International Corporation
100%
31/01/2012
>

BAF. Warehouse Door Replacement – Guard Rail Electric

Completed Projects
Mantech International Corporation
100%
13/01/2012
>

Construct West And East Side De-Icing Stations

Completed Projects
US Army, Bagram Airfield
100%
12/12/2011
>

10 CHU Work

Completed Projects
Mantech International Corporation
100%
01/12/2011
>

401st AFSB Conex Remodel (Office Containers)

Completed Projects
US Army, Bagram Airfield
100%
17/09/2011
>

ASL Storage

Completed Projects
ManTech Technical Services
100%
12/07/2011
>

Cable Pulling

Completed Projects
DynCorp International
100%
02/06/2011
>

Shower Latrine

Completed Projects
ManTech Technical Services
100%
12/05/2011
>

Providing Of And Delivering 4 Each, 20 Foot, Dry Chu

Completed Projects
ManTech Technical Services
100%
24/04/2011
>

Containerized Housing Unit

Completed Projects
Mantech International Corporation
100%
24/04/2011
>

Medical Clinic Fitout

Completed Projects
DynCorp International
100%
10/04/2011
>

Overhead Cover Structure @ C-Ramp

Completed Projects
US Army, Bagram Airfield
100%
29/03/2011
>

Prime Power Con. To Rlbs In Camp Warthog/EMSG

Completed Projects
US Army, Bagram Airfield
100%
07/02/2011
>

Oil Water Separators / Waste Oil Storage Tank

Completed Projects
DynCorp International
100%
04/02/2011
>

Toilet And Showers Building Site Utilities

Completed Projects
DynCorp International
100%
29/01/2011
>

Medical Incinerator

Completed Projects
Corp International
100%
29/01/2011
>

Pemb Fit-Outs

Completed Projects
DynCorp International, Gambari Ana Garrison
100%
28/01/2011
>

Socom Mazzanine And Sliding Door

Completed Projects
ManTech Technical Services
100%
12/01/2011
>

Construct Latrine Facility

Completed Projects
US Army, Bagram Airfield
100%
05/12/2010
>

Completion 4 Ronco Rlbs

Completed Projects
ECCI
100%
30/11/2010
>

FRA Maintenance Building Electrical

Completed Projects
US Army, Bagram Airfield
100%
12/11/2010
>

Electrical Conduit/Wire Distribution / Phase I And Phase II

Completed Projects
DynCorp International
100%
30/10/2010
>

Power Plant Installation

Completed Projects
DynCorp International
100%
25/10/2010
>

36 BHuts and Electrical Works

Completed Projects
US Army
100%
24/10/2010
>

13 Bldgs, Afghanistan Defense University

Completed Projects
Amec
100%
12/09/2010
>

Build MRAP Inspection facility/ Build MRAP Maintenance facility

Completed Projects
US Army
100%
28/08/2010
>

Build AMC Latrine

Completed Projects
US Army
100%
28/08/2010
>

Construct AMC MRAP Inspection Facility

Completed Projects
US Army
100%
28/08/2010
>

FN Housing Facility

Completed Projects
US Army
100%
15/08/2010
>

Construct two 24 ft x 40 ft Conex Office Building

Completed Projects
US Army
100%
10/04/2010
>

Sidewalks and Misc. Work

Completed Projects
Amec
100%
17/02/2010
>

Chain Link Fencing along Stone Wall

Completed Projects
Amec
100%
06/02/2010
>

Storm Water Protection for Chain Link Fence

Completed Projects
Amec
100%
15/01/2010
>

Repair Bathroom / Billeting Facilities

Completed Projects
39 Cons/LGC
100%
14/07/2009
>

Fiber Optic Installation

Completed Projects
KBR
100%
30/06/2009
>

Repair Electric Panels Bldg.# 500

Completed Projects
39 Cons/LGC
100%
22/05/2009
>

100 Feet Communication Tower

Completed Projects
KBR
100%
28/02/2009
>

Repair Water Mains

Completed Projects
39 Cons/LGC
100%
15/04/2008
>

Ice Plant TCN Skill Labor – Manpower

Completed Projects
KBR
100%
31/12/2006
>

Road Crew and Road Crew Leads

Completed Projects
KBR
100%
31/12/2006
>

Shutle Bus Services Labor Truck Drivers & Welders –Manpower and Services

Completed Projects
KBR
100%
31/10/2006
>

380Feet Communication Tower

Completed Projects
AMEC
100%
09/10/2006
>

HVAC System Installation For BLDG. 2709

Completed Projects
KBR
100%
03/07/2006
>

Repair Power Supply Bldg. 526

Completed Projects
39 Cons/LGC
100%
06/07/2006
>

HVAC System Installation For BLDG 3403-3404

Completed Projects
KBR
100%
15/06/2006
>

HVAC System Installation for BLDG #4401

Completed Projects
KBR
100%
30/05/2006
>

80 Feet Communication Tower (2.Each)

Completed Projects
KBR
100%
12/03/2006
>

New Man Camp Installation

Completed Projects
Sandi Group
100%
27/01/2006
>

Locksmith Labor

Completed Projects
KBR
100%
31/12/2005
>

CNS Back-up Power Ballpark Lights

Completed Projects
39 Cons/LGC
100%
18/10/2005
>

Provide Potable Water Truck For Lease

Completed Projects
KBR
100%
25/08/2005
>

Renovation Works BLDG. 2809 (New PX)

Completed Projects
KBR
100%
21/06/2005
>

Renovation Works BLDG. #411-419

Completed Projects
KBR
100%
11/06/2005
>

Equipment Rental

Completed Projects
KBR
100%
15/05/2005
>

Renovation Works BLDG.#2809-2810

Completed Projects
KBR
100%
15/02/2005
>

Renovation Works BLDG. #2802-2901 -2902(Combat Sup. Hospital)

Completed Projects
KBR
100%
02/02/2005
>

Maintenance and Repair Services for Land Mobile Radios

Completed Projects
39 Cons/LGC
100%
31/12/2004
>

Provide&Install Addtl. Bldg to Existing Gym

Completed Projects
KBR
100%
25/08/2004
>

Construct DODDS Administration Facility

Completed Projects
39 Cons/LGC
100%
25/06/2004
>

Provide & Install 80 ft Radio Antenna Tower

Completed Projects
KBR
100%
12/06/2004
>

Demolition Works BLDG. #2802-2901 -2902(Combat Sup. Hospital)

Completed Projects
KBR
100%
10/06/2004
>

Demolition Works BLDG. # 411-419

Completed Projects
KBR
100%
26/05/2004
>

Renovation of Gymnasium

Completed Projects
KBR, 1EA 350 KVA Gen MTS Inst
100%
19/03/2004
>

Renovation of Recreation Center

Completed Projects
KBR, 1EA 350 KVA Gen MTS Inst
100%
16/03/2004
>

Repair Water and Sewer System at Balgat Station

Completed Projects
39 Cons/LGC
100%
25/05/2003
>

Construct Personnel Tent(12.8 x 33.2 x 3m)

Completed Projects
39 Cons/LGC
100%
04/04/2003
>

Preparation & Installation of Sea Type Containers

Completed Projects
Incirlik AB / Türkiye
100%
24/02/2003
>
Loading projects
Something went wrong, please try again later or contact the site administratorX
© 2019 - Artek Construction
  • Türkçe
  • Aren Montenegro E-Katalog